Construction Of Bottom Ash Slurry Tank For Unit 3&4.
Construction Of Ash Dyke Inside Plant For Emergency Disposal Od Ash.
Physical Measurement Of Coal Stock Pile By Computerized Method.
Assistance In Operation, Analysis And Sampling. (EXPIRED)