Underground Cable Laying Works For Electricity Supply Network At Permanent Colony Of Kameng Hydro Power Station, Neepco, Kimi, Arunachal Pradesh - Part A Excavation Of Cable Trenches And Refilling The Trenches. Part B Laying Of 3.5cx300 Sq. Mm And 3.5cx50 (EXPIRED)