Increasing the retention of the Cienka river catchment area by rebuilding the weirs at km 4 ♦ 332 and 6 + 380 in the town of Dybska Kuynia and Daniec, along with the deepening of the river bed in the section between the weirs , Reconstruction of the weir on the Jaryszowiec river at km 1 *200. , Increasing ret. of the Strumiey Byydowski catchment -construction of damming structures on the c. St. Byydowski at km 5 ♦ 780-7 + 350 and c. , Mokrznia (p. Byydowski) at km 3 + 790-4 ♦ 420 in ,Niegowonice and Dybrowa Górnicza Demolition of the existing and construction of a new directional lock on the chapter of the Branicki Canal along with shaping the cross-section of the bed (EXPIRED)