Establishing 1X10Mva, 110/11Kv Substation At Bommanal By Constructing 110Kv Lilo Line With Lynx Conductor From One Circuit Of 110Kv Raibagh-Itnal Dc Line For A Distance Of 0.559Kms In Raibag Taluk, Belgaum District - On Partial Turnkey Basis Including Supply Of All Matching Materials/ Equipments (Excluding 11Kv Switchgear) And Erection (Including Civil Works) Of All Materials/ Equipments, Testing And Commissioning . (EXPIRED)