82 / GR / PO / P9 / PM / 2022, Mon. Designing and separating two separate installations from DPE's production assets along with the installation of a gas or electric water boiler with a capacity of 3.5 MWt and a gas water boiler with a capacity of 5.5 MWt Z95 / 2035/1 (EXPIRED)