Construction of Ablution (Bathroom buildings)in Price Barrack for the Belize Defence Force. Construction of two (2) bathroom buildings for the military personnel at Price Barracks, Rehabilitation of Sewer System in Price Barracks. 201.22 ml rehabilitation of the residual water conduction pipeline in Price Barracks. Replace 4” tubing, the tranche begins at the last inspection chamber before reaching the water treatment plant. Along the new pipeline, cleaning and inspection boxes will be built every 24.4 ml (80 feet)., Renovation buildings from Air Wing Camp. Renovation of ten (10) buildings from Air Wing Camp. The works consist of window replacement, interior and exterior paintjob, ceiling repairs, replacement of roof fascia, light replacement and installation of ceiling fans. It is estimated that the repair area amongst all buildings totals 10,800 ft2 (1,003.87 m2). (EXPIRED)