“The implementation of construction and installation works on the device of waterproofing and deformation seams of the surfaces of monolithic railway pedestrian transition structures No. 2 with staircases No. 2.3, sanitary nodes No. 1.2 of the Street Novator station on the metro: “Trinity Line of the Metro, metro station“ Bachurinskaya metro ”station. (EXPIRED)