CONSTRUCTION OF 490 M Ø 120 CM DIAMETER BULK PILE, 105 TONS OF RIBBED REINFORCEMENT STEEL SUPPLY AND WORKMANSHIP, 42 TONS OF CONSTRUCTION WITH ALL KINDS OF PROFILES, STEEL BAR AND STEEL SHEET, 200 M2 ELEVATOR MASTERING WITH 60 MATERIAL ELEVATORS AND 60 TEMPEL GLASS COVERING, ALUMINUM PROFILES AND TEMPEL GLASS COATING WITH ALUMINUM TEMPEL GLASS COVERING. DISASSEMBLY OF STEEL PEDESTRIAN OVERPASS BRIDGE WORKS WILL BE DONE (EXPIRED)