Hire to request permission to use the area within the forest area. For the construction and maintenance of the 230 kV electrical network system, Khlong Ngae - Satun (phase 1) (the adjustment period and the boundary line of the electric network system) No. EGAT (DOC-Kor.) - Mon. 14/2565 (EXPIRED)