CONSTRUCTION OF DAR ES SALAAM BUS RAPID TRANSIT (BRT) INFRASTRUCTURE - PHASE 4 – PACKAGE A: LOT 1: ROAD WORKS (13.5 KM) FROM CBD MAKTABA YA TAIFA TO MWENGE/UBUNGO (SUM NUJOMA) INCLUDING BRIDGE (1NOs), TERMINALS (2 NOS), BUS STATIONS (20 NOs) AND FEEDER STATIONS (10 NOs) AND LOT 2: ROAD WORKS 15.63 KM; FROM MWENGE TO TEGETA (DAWASA) INCLUDING BRIDGES (4 NOs), TERMINALS (3 NOs), BUS STATIONS (19 NOs) AND FEEDER STATIONS (5 NOs). (EXPIRED)