Supply, test, transport, construction, erection, testing and commissioning of new 33/11KV substation, Additional/Augmentation power transformer, HT line OH/UG, and other allied works, including Five year guarantee for 6 major equipment (power transformer, conductor, Switchgear & control gear (including 33 KV/11 KV Breakers and panels), metering equipment, APFC and HT/LT cables) and 2 years defects liability period for works and minor items i.e. insulator, clamps, angles and channels etc under the AG POLICY 2020 project (ACF) on single point responsibility, indivisible “Turnkey” contract basis under Malegaon Circle (EXPIRED)