Execution of work on the development of design and working documentation and the performance of survey work for patching with maps of a continuous overlap (up to one hundred meters) of an asphalt concrete pavement (second layer) with the elimination of heaving of the highway along the street. Ostrovsky in the working settlement of Suzun, Suzunsky district, Novosibirsk region (EXPIRED)