Monsoon Damage Restoration on AIeBridge -Taraythang Road (Chainage: 0.565, 1.45-1.53, 2.325, 2.68-2.89, 3.2-3.44, 3.605, 14.705, 19.26, 25.71 & 31.7 km) Construction of RRM WAll, Gabion Wall & V-Drain (EXPIRED)