Protection Work Along The Water Pipe Corridor Through Rubble Masonry, Caulking, Construction Of Drain, Guard Wall And Epoxy Painting On Pipes Etc. From Wtp U 1-3 And Wtp 5-6 To Cw Pump House 1-3 At Dvc, Mtps/Mt/Civil/22-23/Sm(30)/111/2022_Dvc_136584_1 (EXPIRED)