Installation Of Sub-Sockets, Sockets And Switches, Laying Of Cables In The Ward, Installation Of Distribution Boxes With Connections, Replacement Of Lamps, Laying Of Cables, Installation Of Avr, Connection To The Network, Connection To The Generator And Its Start-Up. (EXPIRED)