Replacement of faulty cable with new cable from LT Panel near B Block to LT panel below staircase in L-Block including supplying, excavation, laying in ground, trench and on wall surface and end termination at Karampura Campus of Dr. B.R.Ambedkar University Delhi (EXPIRED)