Development Of Technical Documentation Along With Works In The Scope Of: Task I Of Adjusting Fields No. 13 And No. 8 At The Wołomin Substation, Connection Conditions No. 21-G0/Wp/00198, 20-G0/Wp/00544 And No. 20-G0/Wp/00545 . Task Ii: Equipment For Field No. 25 In The Piorunów Substation, Connection Conditions No. 22-G0/Wp/00394. Task Iii: Adaptation Of Field No. 9 In The Goworki Substation, Connection Conditions 22-G0/Wp/00462. (EXPIRED)