Removal Of Spilled Coal At Transfer Point No.01 And 2, Below Conveyor 2.1 And 2.2 , Conveyor C-5A Tail ,Near C-2A Drive House, Below Conveyor C-9 And Near Silo By Truck And Labor Including Weighing And Unloading At Crusher Hopper At Chp Dch/Dch/Enm/Tender/Chp/23-24/012/2023_Ncl_280604_1 (EXPIRED)