---Brackish Water Desalination Plant With A Production Capacity Of 1000 Cubic Meters Of Drinking Water Per Day. ---Transportation, Installation, Interconnection And Other Infrastructure For The Full Operation Of The Unit. The Siting Of This Unit Will Take Place On A Plot Of Land In The "Mesa Dolos" Area, Of The Municipality Of West Mani, Near The Already Operating Well. (EXPIRED)