Turnkey Construction Of The Facility: “Technical Modernization Of The Control System Of The Ri-10 Rope Machine No. 287-296, 299 With The Installation Of A Vfd And An Otmot-Domot Length Control System For 11 Rope Machines” (EXPIRED)