Dk 021: 2015: 45450000-6 Other Final Construction Works "Overhaul Of Sections (Picket 6-17 And Picket 27-33) Of The Third Thread Of Pressure Water Pipeline D 500 Mm With A Length Of 1726 M.P. (Water Pipe From The Pumping Station Of The Ii Rise To The Pumping Station Of The Iii Rise) With The Replacement Of The Existing Pipe With The Sdr 26 Pipe... (EXPIRED)