Resolution Of The General Directorate Of The Railway Sector By Which Public Information Is Opened And The Owners Of The Affected Assets And Rights Are Summoned To Draw Up The Previous Minutes Corresponding To The Forced Expropriation File 225Adif2497 Motivated By The Works Of The "Construction Project. Suspension Of The Level Crossing At Point 5/037 Of The León – Matallana Metric Gauge Line (Ram). (EXPIRED)