Construction Of Two Double-Track Cable Lines. 110 Kv, Together With Concurrent Fiber Optic Lines, Relationship: Se 220/110 Kv Nysa Power Station - Existing Overhead Cable String Of 110 Kv Line, Relationship: Gpz Orlęta-Gpz Radzikowice-Gpz Cieszanowice, And Execution Of Necessary Works (Including Technical Design .) In Secondary Circuits In Gpz Cieszanowice, Gpz Orlęta, Gpz Radzikowice And The Se 220/110 Kv Nysa Station.