Passive It Installation Work In General Contractor: - 22 19-Inch Rack Cabinets With Cabling, Equipment And Cooling - 2 132.5 Kw Cold Production Groups - 2 178 Kw Air Coolers - 2 Automatic Extinguishing Systems (Approx. 532 M3) The Duration Of The Work Is 110 Working Days, To Begin In The 2Nd Half Of 2024. The Work Is Awarded At Unit Prices.