Drainage canal work (DIN 18 306); Comprehensive cleaning of the historic "Neue Mühle" canal, including cutting back existing roots inside the canal. Mussels and slag up to 30 cm high have accumulated in the bottom area, and these are also to be removed during the cleaning process. The cleaning work must be carried out carefully so as not to damage the structure. (EXPIRED)