Execution Of The Works Included In The Technical Execution Report For The Definitive Installation Of Regenerated Water At The Manresa Wwtp. This Action Consists Of A New Facility For The Production And Loading Of Regenerated Water From The Treated Water Of The Wwtp. This New Installation Will Be Made Up Of The Elements Of Capturing Purified Water, Filtering, Treatment, Storage With A New Tank Of 40 M³ Capacity, Distribution With A New Pressure Group And Finally A Charging Point Automated By The Filling Of Tanker Trucks. The Necessary New Power Supply And Electrical Protection Installations, As Well As Control And Remote Control, Will Also Be Made. (EXPIRED)