The Entire Consultation Concerns: - The Construction Of Transformer Stations On The Euradouai Site During The Year 2024/2025 - Other Developments Are Concerned By A Station During The Year 2024/2025/2026 Three Types Of Internal Dimensions Of Stations Are To Be Retained With A Height Under High Slab Of 2.50M: - Type 1: Station Of 3.80M × 3.30M - Type 2: Station Of 4.00M × 3.00M - Type 3: Station Of 3.80M × 3.80M