1.1.1. Project And Cost Accounting Documentation Required For The Dismantling Of The Two-Story Building #10 And The Dismantling Of The Building #11 Of The "National Center For The Preparation Of The Olympic Reserves Of Georgia" Preparation Of Cost Estimate Of Works. (EXPIRED)