The Contractor Selection Plan For The Project Investment Preparation Phase: Complete The Technical Infrastructure Of The Planning Box G.2/Cc1 And The 13.5M Planning Route Adjacent To The Planning Box G.2/Cc1 Connected To Co Linh Street, Long Bien Ward, Long Bien District