Supervision And Performing The Function Of A Contract Engineer For The Task Entitled: "Construction Of The Second Railway Track With The Second Bridge Crossing On The Warta River On The Section Of Railway Line No. 354 From The Branch Post Oborniki Wielkopolskie Bridge To The Oborniki Wielkopolskie Station