The Purpose Of The Contract Is The Execution Of The Action 1 Plan Of The El Berrueco Embellient Plan, Through: Lot 1: Sculpture Placement Works. Lot 2: Supply And Installation Of Urban Furniture. The Contract Will Be Processed As A Single File Divided Into Two Lots.