Electrical Installations Of A Building Including: - A Medium Voltage Station; - A 630Kva Transformer; - A 410 Kva Generator; - A Photovoltaic Installation Of ± 66 Kwp; - Low Voltage And Low Current Installations; - Fire Detection Installations And Emergency Lighting. The Duration Of The Work Is 520 Working Days, To Be Started In The 1St Quarter Of 2026. The Work Is Sold At Unit Prices.