Large Of The Work (Civilian & Electromechanical Engineering): - Prv Pipes (Dn2600): ~ 35 Ml - Ba Pipes (Dn600): ~ 100 Ml - Drinking Water Driving In Ductile Cast Iron (Diam. 90 Mm): ~ 10 Ml - Installation Of Dry Networks (Creos, Post): ~ 270 Ml - Realization Earthmoils/ Efblage: ~ 2000 M3 - “Electromechanical” Works And Equipment Works Beginning Of The Work: March 2026 Duration Of The Work: 350 Working Days