The Purpose Of This Specifications Is To Carry Out The Technical Assistance For The Deployment Of The Mobility Master Plan (Pdm): Strategic Initial Document (Die), Which Includes The Following Tasks That Are Detailed In The Particular Technical Prescriptions (Ppt): 1. Introduction And Context Of The Pdm, With Special Mention To The Results Of The Atm Work So Far. 2. The Die Will Deepen The Territorial And Mobility Model Of The Camp De Tarragona, Based On The Work Already Done To End Up Making An Environmental Diagnosis Of The Mobility System Of The Camp De Tarragona. 3. Preliminary Evaluation Of Environmental Risks Linked To Mobility. 4. Preliminary Evaluation Of Environmental Impacts Linked To Mobility. 5. Preliminary Evaluation Of The Main Mobility Runners Of Camp De Tarragona. 6. Establish Reference Environmental Objectives. 7. Make A Proposal Of Follow -Up Indicators. 8. Description Of The Zero Alternative And Indication And Evaluation Of The Possible Alternatives To Achieve The Best Proposal. 9. A Sketch Where The Future Proposals Can Go.