Development/Update Of Project Documentation And Based On It. Execution Of Construction Works Consisting In: Task 1-Building Gpz 110/15 V Chrzanów Zone With 110Kv Supply Lines, Task 2-Construction Of An Interior Station With A 2-Vegetable 15Kv Switchgear (Rs Zone), 3-Construction Task Of 15Kv Cable Cable Connections In The Gpz Zone Gpz And Designed Gpz Zone And Designed Gpz Zone And Designed Gpz Zone And Designed Gpz Zone Gpz Rs Zone With An Existing 15Kv Network.