Mechanized Excavation,Loading,Trans. And Unloading At New Siding Route No.3 Loading Yard Of D10&11A And Further Loading Into Railway Wagons For Total Qty Of 4.00(+/-20%)Lt Tons Of Iron Ore Fines & Lump From D10&11A Stockpiles/Techpro Stockpiles At Lp (EXPIRED)