The Property Of The Purchase Is The Rehabilitation Works Of The Road And The Babbi District Of The Village Of Ghvavori In Chiatura Municipality, These Works Should Be Carried Out In Two Stages: 1. The First Phase Works Should Be Carried Out In 2025 At Least Gel 10000 (The First Stage Should Not Include Work That Requires Additional Costs To Start The Second Stage, With The Supplier To Pay Additional Costs). 2. The Second Stage Works Will Be Carried Out In 2026.