The Procurement Of The Purchase Is The Rehabilitation Works Of The Chaladze Pecs In The Village Of Ragan In Yaturi Municipality, These Works Must Be Carried Out In Two Stages: 1. The First Phase Works Should Be Carried Out In 2025 At Least Gel 1000 (The First Stage Should Not Include Work That Requires Additional Costs To Start The Second Stage, And The Supplier Will Pay Additional Costs). 2. The Second Stage Works Will Be Carried Out In 2026.