The Procurement Is The Work Of The Road To The School In The Village Of Perevia In Chiatura Municipality, And These Works Must Be Carried Out In Two Stages: 1. The First Phase Works Should Be Carried Out In 2025 At Least Gel 1000 (The First Stage Should Not Include Work That Requires Additional Costs To Start The Second Stage, And The Supplier Will Pay Additional Costs). 2. The Second Stage Works Will Be Carried Out In 2026.