Delivery And Assembly Of A Gas Engine To The Landfill Biogas And Fermentation To The He-Lg 330/365 -L65 -L332-B Cogeneration Aggregate, With A Power Adapted To The Heat Exchanger And To The Generator, In A Container Housing.