The Market Relates To The Complete Renovation Of The Roof Of The Cultural Center As Well As The Waterproofing Work Of An Adjoining New Health Block. The Services Include Dismantling The Existing Roof Over An Area Of ​​Around 260 M² And The Reconstruction Of A New Roof That Meets The Standards In Force In Place. The Entire Roof Of The Cultural Center Will Be Equipped With Suitable Insulation And Seal. The Work Also Provides Waterproofing And Insulation Of The Roof Of The Sanitary Block Of An Area Of ​​Approximately 43 M², As Well As The Creation Of An External Facing On This Block, With A Wooden Cladding Covering Approximately 100 M², Integrating Insulation, Vapor Barrier And Subcontrust. The Contractual Duration Of The Work Is 120 Working Days, With A Start -Up Scheduled For November 2025. The Market Is Sold At Unit Prices.