In Accordance With The Draft Draft, The Need To Be Satisfied Is: The Construction Of A New Deposit Of 2,000 M³ To Resolve The Grave Deficit Of Drinking Water Regulation Of The Municipality, At The Same Time, Given The Shortcomings Of The High Distribution Network That Starts From The Regulation Deposit, To Improve Its Conditions When It Comes To Providing The New Facilities Associated With The Incorporation Of The New Deposit.