"Installation Of A Hydropower System For The Recovery Of Electricity From Water Discharged From The Surface To Level 795 Via A Dn 200 Pipeline, Along With Connecting The Installation To The Power Grid And Fire Protection Installation Of The Lw Bogdanka Mine In The Bogdanka Field" - In Accordance With The Provisions Of The Swz