Lyon 1 And 2 - Redevelopment Of The Quays Of The Right Bank Of The Rhône - Operational Phase N°1: Wilson Section / Passerelle Du Collège And Voie Lyonnaise 6 In Its Entirety. Lot 2 Roads And Various Networks. Lot 3 Public Lighting. Lot 4 Three-Color Light Signaling. Lot 5 Green Spaces-Furniture-Games. Lot 6 Civil Engineering, Heritage - High Platforms. Lot 7 Civil Engineering Lower Ports And Plant Engineering