Removal Of Temporary Laid Water Pipeline 300 Nb, 250 Nb, 150 Nb Pipe By Cutting, Stacking And Shifting From Cwph Area To Esp-I/L Side Through Fgd Area And From Esp Control Building To Chlorination Building At 1X660 Mw Sagardighi Site.