1.Lowering And Installation Of 3 Nos Submersible Pumps 2. Lowering, Carrying, Laying Including Dressing, Cutting And Levelling The Floor And Fitting Of 100 Nos 6Inch Ms Pipe And Pump Motor Set Along With Bed Plate And Electrical Accessories.