Expected Start Of Work: October 2026 Duration Of Work: 60 Days Scope Of The Work: Creation Of A Water Feature On The Ground Including A Technical Work Bringing Together A Pump Room And An Area Dedicated To Water Treatment, Preparatory And Earthworks For The Technical Works, The Supply And Installation Of Hydraulic Equipment (16 Drivable Ground Nozzles Of Different Types, As Well As 6 Misting Steles), The Control, Recirculation And Water Treatment Systems, The Water Supply, The Pipe Networks, As Well As The Creation Of A Concrete Surface Poured On Site With Reinforcements And Waterproof Joints.