Construction Of New 125mm X 40mm Dia X 61 Meter Deep Hand Operated T/well With I Ndia Mark Ii Hand Pump With Platform And Drain In Different Blocks Under Special Central Assistance To Scheduled Caste Su B Plan (sca To Scsp) For The Year 2021-22. (EXPIRED)