General Civil Works In Ccpp I, Ii & Iii At Gbps.
Excavation With Manual Labour For Foundation Up To 1.5 M Depth Including Sorting Out And Stacking Of Useful Materials And Disposing Of The Excavated Stuff Up To 50 Meter Lead (b) Loose Or Soft Soil. <
(EXPIRED)