Preparation Of Project-Estimate Documents For Relevant Infrastructure Facilities (Electric Power, Gas Sewage System, Technical And Drinking Water Network) In Order To Ensure The Activities Of Residents In The Newly Allocated 3.92 Ha Area For The Expansion Of The Territory Of "Sumgayit Chemical Industrial Park" (EXPIRED)